Scottsdale Building Codes

Adopted I-code editions, residential permit and inspection steps, hillside and Environmentally Sensitive Lands rules, zoning setbacks, green building, and fees for a custom home in Scottsdale.

Maricopa County10 pages
Permits

Scottsdale Block Wall, Fence, and Retaining Wall Permits: When You Need One

In Scottsdale you need a permit to build any fence over 3 feet tall, a dry-stack or interlocking block wall over 30 inches, or any retaining wall at all. Walls and fences 3 feet and under skip the permit but still need a free courtesy site plan check. Every retaining wall needs engineered plans.

Read the reference

Scottsdale Building Permit and Impact Fees for a New Home: What You Actually Pay

Scottsdale charges new-home permit fees by square foot, not by valuation. A custom home pays a $195 base fee, $0.94 per square foot of air-conditioned area, and $0.54 per square foot of covered non-A/C area, plus a $379 Certificate of Occupancy. Water and sewer development fees are billed separately by meter size.

Read the reference

Scottsdale Pool and Spa Permit and Barrier Requirements: What You File and Fence

A pool or spa in Scottsdale needs its own building permit, and the city will not issue it until a permitted home already sits on the lot. You file a scaled site plan and pool engineering. State law requires a five-foot barrier with a self-latching gate around the water before you can fill it.

Read the reference

Scottsdale Residential Building Permit Requirements: What You File and What It Costs

A new home in Scottsdale needs a building permit before any work starts. You apply through the Scottsdale SPUR portal with a site plan, floor plans, and engineered construction documents, pay plan-review fees based on square footage, and wait for staff review and approval before the permit issues.

Read the reference

Scottsdale Solar PV Permit: The Small-Scope Review Path for Rooftop Panels

A rooftop solar PV system in Scottsdale needs a building permit, and every application gets reviewed. An array that meets the city's panel placement guidelines qualifies for a fast small-scope review. Ground-mounted systems and layouts that break the guidelines go to full plan review. Wiring follows the 2020 electrical code.

Read the reference
All cities

Building in Scottsdale?

Tell us your lot and we'll walk you through the codes, permits, and fees that apply.

How can we help?

Call usText us